Road Closures for Highland Canal Storm Drain Project - KTVN Channel 2 - Reno Tahoe Sparks News, Weather, Video

Road Closures for Highland Canal Storm Drain Project

Posted: Updated:

The City of Reno says there will be road closures for utility work on the Highland Canal Storm Drain Project.

Starting Monday, July 31, there will be construction on Mesa Park Road/Mae Anne Avenue with road closures from West Fourth Street to Leroy Street. 

Construction is expected to take about four weeks and will take place Monday through Friday from 7 am until 7 pm.

The City says detour signs will be posted and they are asking drivers and bicyclists to use an alternate route during construction.

The City of Reno, Truckee Meadows Water Authority and Washoe County are partnering on the Highland Canal Storm Drain Project which is designed to capture and convey stormwater in a constructed collection system to reduce sources of stormwater pollution into the Highland Canal.

For the latest road closure information during the project, visit Reno.Gov/RoadClosures.

Powered by Frankly
All content © Copyright 2000 - 2017 Sarkes Tarzian, Inc. All Rights Reserved. For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices.