Lane Closures for US-50 Resurfacing Project - KTVN Channel 2 - Reno Tahoe Sparks News, Weather, Video

Lane Closures for US-50 Resurfacing Project

Posted: Updated:

Friday the Nevada Department of Transportation is closing roads on US-50 in Dayton to complete the final phase of resurfacing construction there.

NDOT says single-lane closures will take place between 6:00 a.m. and 7:00 p.m Friday while crews smooth and repave a roadway dip. Crews will work on eastbound lanes in the morning, and move to westbound lanes in the afternoon and evening. Lane closures could continue into the weekend.

In May 2017, NDOT injected a polyurethane solution that expanded underneath the roadway and lifted the depression. NDOT says the road is stabilized, now crews will work to smooth and repave cracking.

NDOT asks drivers to anticipate possible future delays on US-50 near 2nd Street while Lyon County replaces a water main and sidewalks.

Powered by Frankly
All content © Copyright 2000 - 2017 Sarkes Tarzian, Inc. All Rights Reserved. For more information on this site, please read our Privacy Policy, and Terms of Service, and Ad Choices.